Below is a list of NCE’s recent and noteworthy Projects:

DSC00750.JPG

OLIFANTS RIVER WATER RESOURCES DEVELOPMENT PROJECT PHASE 2

Ndodana Consulting Engineers (in JV) were appointed to carry out the civil and structural design work. Current scope includes the extraction and distribution of water from De Hoop Dam to several end points through pipelines ranging from 1800mm to 1100mm in diameter. A 13MW Steelpoort pumpstation has been built along the pipeline and to conserve energy, the pumpstation is linked directly to the dam by a 40km long suction main. This segment of the project also makes use of fibre optic cables, linking all elements to a single remote control centre that monitors and controls developments. Further phases will include a 70km, 1100 diameter pumping main from the Flag Boshielo Dam to the town of Mokopane, for which three pumpstations of 4MW each are required. Bulk water pipelines from the 13MW Steelpoort pumpstation will be installed to supply the communities and new mining developments of the Lepelle-Nkumpi, Fetakgomo and Greater Tubatse municipalities in Limpopo. Upon completion, the project will link the De Hoop and Flag Boshielo dams and will carry bulk water to Steelpoort’s mines, surrounding communities and the Lebalelo Bulk Water Scheme.

Client: Trans Caledon Tunnel Authority (TCTA) & Department of Water & Sanitation (DWS)

IMG_5301.jpg

Gautrain Rapid Rail Link

Ndodana Consulting Engineers were responsible for the civil and structural engineering design of the Train and Bus Depots for the Gautrain Rapid Rail Project. Located on a 26ha site in Midrand, the depot serves as the administrative, maintenance and energy headquarters for the rail link and for the associated bus network serving the rail link.

Client: Bombela

800x450-5.jpeg

Gautrain Rapid Rail Link Stations

Ndodana Consulting Engineers were also responsible for the structural engineering design of O R Tambo International Airport and Rhodesfield stations.

Client: Bombela

1024_031210091312_11_9lbcp.jpg

Automotive Supplier Park

Ndodana Consulting Engineers carried out the structural design for the Automotive Supplier Park in the East London Industrial Development Zone, total area of buildings is 55,000m².

Client: East London Industrial Development Zone

Overall.jpg

O R Tambo International Airport

Ndodana Consulting Engineers have undertaken various projects for Airports Company South Africa at O R Tambo International Airport:

• Design of Rapid Exit Taxiways and Holding Bay on Runway 03L.

• Structural design of upgrading of International Terminal Building.

• Civil and structural design of Multi-storey Parkade I (4000 parking bays) and Public Transport Terminal.

• Structural design of extension to Multi-storey Parkade I (1200 parking bays).

• Structural design of International Trade Bureau.

• Civil and structural design of Multi-storey Parkade II (5200 parking bays).

• Rehabilitation of Runway 03R/21L and widening of shoulders of Runway 03R/21L to accommodate new Airbus A380.

kpmg-phase-2-05.jpg

KPMG Campus Phase I, II and III, Parktown

Ndodana Consulting Engineers carried out the civil and structural design work for Phases I, II and III. Phase I involved the extensive refurbishment of Wanooka House, to provide the facilities for Head Office. Phases II and III involved 24,000m2 of campus style office buildings and 563 basement parking bays over 5 basement levels.

Client: Old Mutual Property Investments

339098_16051615180042368449.png

City Lodge at

O.R Tambo International Airport

Ndodana Consulting Engineers carried out the structural design work for this 3-level, 303 rooms hotel, being the biggest hotel in the City Lodge Hotels Group. It is situated above the new multi storey parkade.

Client: City Lodge Hotels

Overview.jpg

Nelson Mandela Bay Stadium

Ndodana Consulting Engineers were part of a Consortium that carried out the structural design work for the stadium that hosted some of the 2010 Soccer World Cup matches. The stadium consists of 6 levels and its seating capacity is 45,000 permanent seats plus an additional 4,000 temporary seats. The structure is 43m high with a steel roof weighing 2000 tonnes.

Client: Nelson Mandela Bay Municipality

NCE Brochure October 2019.jpg

Trunk Road R61 from Magusheni via Mbizana to Mzamba

Ndodana Consulting Engineers were responsible for the detail design and site supervision of the upgrading of existing surfaced road to a uniform width equivalent in cross section to a Class 1 Road.

Client: Department of Roads and Public Works, Eastern Cape

Mthatha.JPG

Upgrading of Mthatha Airport

Ndodana Consulting Engineers were responsible for the civil and structural design and supervision of a new surfaced runway, 2730m long and 60m wide, aprons, taxiways and upgrading of hangers.

Client: National Department of Transport